Based on official data and reputable market reports, updated November 2026.

4.58mresidents, end of 2025
AED 917bnreal-estate transactions in 2025
1,253greenfield FDI projects in 2025, No.1 worldwide
46,200homes delivered in 2025 Provisional

The plan: D33 and Dubai 2040

AED 32 trillion

total economic targets of the Dubai Economic Agenda D33, 2023–2033

D33 was launched on 4 January 2023 by His Highness Sheikh Mohammed bin Rashid Al Maktoum. Its aim is to double the size of Dubai's economy within ten years and keep Dubai among the world's top three cities. 2033 is also the 200th anniversary of Dubai's foundation.

D33 targets for 2023–2033

Foreign trade

from AED 14.2 tn in the past decade to AED 25.6 tn

Foreign direct investment

AED 650 bn over ten years (AED 60 bn a year on average, from 32 bn)

Private investment

from AED 790 bn to AED 1 tn

Digital economy

AED 100 bn of new value a year

Transformative projects

100 projects, 400 new trading-partner cities

People

65,000 young Emiratis into the private sector; 30 future unicorns

Dubai 2040 Urban Master Plan

Launched on 13 March 2021, the plan concentrates growth in five urban centres: three existing (Deira and Bur Dubai; Downtown and Business Bay; Dubai Marina and JBR) and two new (Expo 2020 centre and Dubai Silicon Oasis). Nature reserves and rural areas will make up 60% of the emirate, public beaches grow by up to 400%, land for hotels by 134% and land for education and health by 25%.

Progress so far

AED 937bnGDP 2025 · +5.4%
-2.3%GDP, H1 2026 Provisional
1,253FDI projects 2025 · +10.5%

Dubai's GDP reached AED 937 bn in 2025, up 5.4%. Dubai ranked first in the world for greenfield FDI projects for the fifth year running. The first half of 2026 was weaker: real GDP was about 2.3% lower than a year earlier. The GDP method was revised in 2026, so older and newer series are not fully comparable.

Timeline

  1. 2021Dubai 2040 Urban Master Plan
  2. 2023D33 launched
  3. 2026Etihad Rail passenger service; this report
  4. 2029Metro Blue Line opens
  5. 2032Metro Gold Line; Al Maktoum airport first phase
  6. 2033D33 ends; 200 years of Dubai
  7. 20405.8 million residents (2040 plan)

Population

4.58 million

residents at the end of 2025, +332,000 (+7.5%) in one year

Dubai's population roughly doubled in fifteen years. In 2026 the statistics authority moved to a new method based on administrative records, which put the end-2024 figure at 4.25 million instead of the 3.83 million of the old estimate. The two series are shown separately below.

Population, millions
012345620102015202020252030203520402010: 1.91 m2011: 2.00 m2012: 2.11 m2013: 2.21 m2014: 2.33 m2015: 2.45 m2016: 2.70 m2020: 3.30 m2024: 3.83 m2024: 4.25 m2025: 4.58 m2040: 5.80 m
  • Old estimate method
  • New method (administrative records)
  • 2040 plan target

Daytime population

6.39 million

6.39 million people are in the city at peak hours, including about 1.8 million workers and visitors who live elsewhere.

Households Provisional

59,600

About 59,600 new households were added in 2024. The average household has 3.9 to 4.2 people.

The 2040 plan target of 5.8 million was set in 2021 on the old method; on the new method the city is already at 4.58 million, so the target is likely to be revised.

Supply

46,200

homes delivered in 2025, the most in a decade Provisional

Deliveries rose from 30,000–40,000 a year in 2019–2024 to about 46,000 in 2025. Developers have far more scheduled, but schedules slip: by mid-November 2026 about one in five homes with a stated 2026 handover had actually been delivered.

Homes delivered per year
010k20k30k40k20142014: 18,53220152015: 9,14220162016: 16,88620172017: 14,00620182018: 19,65120192019: 30,32720202020: 33,52920212021: 33,76120222022: 32,86720232023: 40,26820242024: 31,56620252025: 46,20020262026: 41,779
Scheduled handovers and expected completions
050k100k150k200k20262026: 195,92620272027: 122,59920282028: 116,61120292029: 66,37220302030: 36,247
  • Scheduled by developers
  • Expected range (Golden Hills estimate)

Bars: handover year stated by developers for homes still under construction (2026 includes delayed projects). Band: range of expected completions in published market forecasts.

Homes under construction by stage of completion

544,731 homes are under construction; most are less than 20% built and will not be ready before 2028.

What is being built

>86%Apartment
66%studios and 1-beds

More than 86% of the pipeline is apartments, and about two thirds are studios and one-bedroom units. Villas and townhouses are a small share of new supply.

New homes launched

  • 202391,884
  • 2024169,258
  • 2025172,959
  • 2026 (to date)78,997

Demand

AED 917bn

value of all real-estate transactions in 2025 (over 270,000), up 20%

2025 was Dubai's strongest year on record. Purchases (investments) passed AED 680 bn in 258,600 deals, up 29% in value. The number of investors reached 193,100, of whom 129,600 were new; residents made up 56.6%.

Sales in 2025 by type Provisional
TypeSalesChange in salesAverage priceChange in average price
Apartment · Off-plan119,407+31%AED 1.35m-2%
Apartment · Ready50,9100%AED 1.15m+11%
Villa / townhouse · Off-plan16,254+50%AED 3.76m-17%
Villa / townhouse · Ready5,190+6%AED 5.90m+17%

Off-plan sales were 70.7% of apartment and villa sales in 2025.

Off-plan absorption by area Provisional

Share of units already sold in projects handing over from 2026 onward.

Dubai South
Apartments sold
63%32,286 units
Villas sold
94%1,533 units
Due 2027–202848%
JVC
Apartments sold
66%29,722 units
Villas sold—
Due 2027–202849%
Dubailand
Apartments sold
69%24,172 units
Villas sold
95%934 units
Due 2027–202870%
Business Bay
Apartments sold
77%20,023 units
Villas sold—
Due 2027–202826%
Dubai Islands
Apartments sold
65%13,623 units
Villas sold
100%646 units
Due 2027–202869%
JVT
Apartments sold
73%10,383 units
Villas sold—
Due 2027–202864%
Dubai Creek Harbour
Apartments sold
96%7,370 units
Villas sold—
Due 2027–202828%
Arjan
Apartments sold
73%6,649 units
Villas sold—
Due 2027–202835%
Dubai Hills Estate
Apartments sold
96%5,895 units
Villas sold
100%104 units
Due 2027–202849%
MBR City
Apartments sold
71%2,960 units
Villas sold—
Due 2027–202855%

2026 so far Provisional

After regional events in early 2026, activity slowed: in the first nine months the value of sales was 20–23% lower than a year earlier, and the price index fell 10.2% from February to October before steadying. Golden visas kept flowing: 66,078 were issued in the first half of 2026.

Surplus or shortage in 2027–2028?

Three scenarios

new homes needed each year in 2027–2028 against homes likely to be delivered

Whether Dubai faces a surplus or a shortage depends on two numbers nobody knows exactly: how fast the population grows and how many scheduled homes are actually finished. We model three cases. They are estimates, not forecasts.

Growth settles at 4.5% and deliveries reach about 60,000 a year.

New homes needed / yr
40,190
Homes delivered / yr
60,000

Difference / yr -19,810 more homes than new households

Golden Hills estimate
Assumptions
ConservativeBaseOptimistic
Population growth2.5%4.5%7%
Share living in households75%78%80%
People per household4.24.03.9
Homes delivered75,00060,00045,000

New homes needed = population growth × share living in households ÷ people per household.

Both sides

What weighs on prices

  • A delivery wave: about 60,000 homes a year are expected in 2026–2028, against 30,000–40,000 a year before.
  • Most new supply is studios and one-bedroom apartments.
  • Prices corrected 10.2% between February and October 2026.
  • Sales value in the first nine months of 2026 was 20–23% lower than a year earlier.

What supports demand

  • The population grew by 332,000 in 2025, about 7.5%.
  • Record foreign investment: 1,253 greenfield projects in 2025, No.1 worldwide.
  • Delivery is slow: only about one in five homes scheduled for 2026 had been delivered by November.
  • Villas and family homes are a small share of the pipeline.

How to read this. In the base case 2027–2028 brings more homes, mostly apartments, than new households, which would hold back prices of small apartments. In the optimistic case the market absorbs the wave. The outcome differs by type and area, which is why chapter 7 looks at them separately.

Megaprojects

AED 128bn

for the new Al Maktoum International passenger terminal, the largest single project

Transport and new waterfront districts decide where the next decade of demand goes. Dates are those announced by each project's owner.

Etihad Rail passenger service Provisional

The national passenger railway connects Dubai (Jumeirah Golf Estates station) with Abu Dhabi and Fujairah; Dubai service from 2026.

Date
2026

Palm Jebel Ali

First villa handovers in phases from late 2026 through 2027; 728 villas on Fronds K–P are in finishing works.

Date
2026–2027

Dubai Islands

Five islands, about 62,000 homes and more than 230,000 residents planned; western shoreline works due by the end of 2027.

Date
2027

Dubai Loop Provisional

Underground transit; first phase of four stations between DIFC and Dubai Mall, later 22 km and 19 stations.

Date
2028
Cost
AED 2bn

Dubai Creek Harbour

A waterfront city for more than 200,000 residents; Dubai Square and a new AED 12 bn business district are under way, due around 2028.

Date
2028

Dubai Metro Blue Line Provisional

30 km, 14 stations, about half underground, with a crossing of Dubai Creek. Opening 9 September 2029.

Date
2029
Cost
AED 20.5bn

Al Maktoum International Airport (DWC)

Up to 260 million passengers a year when complete; five runways and more than 400 aircraft stands. First phase for 150 million passengers due early next decade (2032 reported).

Date
2032
Cost
AED 128bn

Dubai Metro Gold Line Provisional

42 km, fully underground, 18 stations from Al Ghubaiba to Jumeirah Golf Estates through 15 areas. Opening 9 September 2032.

Date
2032
Cost
AED 34bn

What it means for buyers

Type and area

matter more than the market average

The data points in different directions for different buyers. This is a summary of what the numbers show, not personal investment advice.

Families buying to live

Ready villas and townhouses are scarce in the pipeline and their average price rose 17% in 2025. Established communities with schools and transport are the safer choice.

Investors seeking rent

Ready apartments rose 11% in 2025 and gross yields are around 7%. In areas with heavy 2027–2028 handovers, rents for studios and one-bedrooms may soften.

Long-term off-plan buyers

The decade's main infrastructure is being built around the new airport, the metro lines and the waterfront districts. Check the developer's delivery record and the construction stage before buying.

Before you buy, check

  • How many homes hand over in the same area in the next two years.
  • How far the building is built, and the developer's delivery record.
  • Whether the unit type (studio, family home) is in short or plentiful supply.
  • Distance to the metro, the airport and schools.

Browse off-plan projects

Sources

The figures on this page come from these publications, reports and analyses.

  1. Government of Dubai Media Office, “Mohammed bin Rashid launches Dubai Economic Agenda 'D33'”, 4 January 2023.
  2. Government of Dubai Media Office, “Mohammed bin Rashid launches Dubai 2040 Urban Master Plan”, 13 March 2021.
  3. Government of Dubai Media Office, “Hamdan bin Mohammed approves AED1 billion in economic incentives during Dubai Executive Council meeting (Dubai GDP 2025)”, 30 March 2026.
  4. Emirates News Agency (WAM), Dubai Data and Statistics Establishment, “Dubai's GDP reaches AED473 billion in H1 2026”, October 2026.
  5. Government of Dubai Media Office (fDi Markets data), “Dubai ranks No.1 globally for Greenfield FDI projects for fifth consecutive year in 2025”, 23 June 2026.
  6. Digital Dubai, Dubai Data and Statistics Establishment, “Dubai's population tops 4.580 million by the end of 2025, recording 7.5% growth”, 30 July 2026.
  7. Dubai Data and Statistics Establishment, “Population Bulletin, Emirate of Dubai”, 2024 edition.
  8. Dubai Statistics Center, “Year-end population estimates, Emirate of Dubai”, 2010–2016.
  9. Dubai Statistics Center population clock, reported by Khaleej Times, “Dubai population rises to over 3.8 million, marks highest increase since 2018”, January 2025.
  10. Emirates 24|7, citing the Dubai Data and Statistics Establishment, “Dubai's Peak-Time Population Hits 5.13 Million; 59,600 New Households Added in 2024”, 1 May 2025.
  11. AGBI; Dubai Statistics Center (2015 census), “Dubai's population surge to test housing market supply by 2030; average household size, Census 2015”, September 2025; 2015.
  12. Based on DLD transaction registry data, up to 14 November 2026.
  13. Khaleej Times, “Will Dubai housing market see an oversupply in 2026?”, 11 February 2026.
  14. Moody's Ratings, reported by Khaleej Times, “UAE property prices to see modest decline in 12-18 months, says Moody's”, 11 February 2026.
  15. Market reports.
  16. Dubai Land Department, Government of Dubai Media Office, “Dubai's real estate market records new historic milestone with transactions exceeding AED917 billion in 2025”, 12 January 2026.
  17. ValuStrat, “Dubai VPI Residential Values, October 2026”, 10 November 2026.
  18. General Directorate of Identity and Foreigners Affairs Dubai (GDRFA), reported by Gulf News, “Dubai grants 66,000 Golden Visas as 5-year tourist visa surges”, 15 July 2026.
  19. Golden Hills estimate: expected completions 2026–2028 and the 2027–2028 scenarios, built from the figures listed above.
  20. Government of Dubai Media Office, “Al Maktoum International Airport (approval of the new passenger terminal)”, 28 April 2024.
  21. Khaleej Times, “Al Maktoum International accelerates toward world's biggest airport status”, 5 October 2026.
  22. Government of Dubai Media Office, Roads and Transport Authority, “RTA awards Dubai Metro Blue Line contract for AED20.5 billion”, 19 December 2024.
  23. Government of Dubai Media Office, Roads and Transport Authority, “Mohammed bin Rashid approves Dubai Metro's Gold Line spanning 42 km and 18 stations”, 22 April 2026.
  24. Government of Dubai Media Office, Etihad Rail, “UAE President takes Etihad Rail to Dubai; Dubai station opened”, 28 September 2026.
  25. The National, “Dubai Loop work under way with 45,000 tonnes of concrete to be used in tunnel project”, 4 July 2026.
  26. Nakheel, “Dubai's Palm Jebel Ali villas head for first handovers this year; Nakheel unveils 44 beachfront villas on Frond F”, 16 June and 20 August 2026.
  27. Nakheel, Dubai Holding, “Dubai Islands masterplan; marine works contract for the western shoreline”, 2026.
  28. Emaar Properties, “Emaar unveils Dubai Square; Dubai Square Business District”, December 2025 and 9 November 2026.

Get the full report as a PDF

The Golden Hills edition of this report, with all charts and tables. We will send it to you on WhatsApp.

Based on official data and reputable market reports, updated November 2026. Updated every three months. Next update: February 2027.

Provisional figures are built on DLD records or published market ranges and will be replaced by official open data.

This report is for information only and is not investment advice. Estimates and scenarios are Golden Hills calculations from the figures shown.

WhatsApp